Stabilization and landscaping

Project

Stabilization of the strips adjacent to the runway and landscaping in all off runway areas and angares at the airport of Lima (Peru). Stabilization of 15 cm, dust control irrigation and landscaping.

Product Used: Zycobond

Description

LOCATION
Lima (Peru)
CONSTRUCTOR
Fronpeca
LENGTH
700.000 m2
CONTRACT
Stabilization and improvement work
WORK TIME
6 months
STATE
Finished